The brick wall now has the rebar behind it and is ready for the shotcrete.
The tunnel second layer of rebar has been quality checked and the third layer of rebar is being applied.
Quality Control is still ongoing on the rest of the house structure.
Bill and I visited the 'pool' area, and found tadpoles as well as mosquito larvae. So we shall leave them be and watch that they get enough rainfall.
We also visited the dirt wall behind the garage. It used to be 14 feet high but because the back-filling started awhile back, it is more like 10 feet high. In that wall, some bees have decided to build their tunnel nests.