The contractor came and laid the cable underground.  A couple of days later, the electric company came and hooked the cable to the meter and to the line, so the connection is made.  The main switch is still off.  We await the electricians to come and do that.  However, we want them to be able to do more.  We need to have a light fixture in place in the garage, AND, some wood on the tunnel wall for them to install the breaker panel.  We also would like the phone company to get their underground cable in place before the electricians' arrival.