Primer Applied |
Applying Liquid EPDM |
On Friday, we were joined by Henemias and Christian. We applied Liquid EPDM over the primer and then added more primer so that the whole main structure was at least primed with the top still needed the Liquid EPDM.
Applying the WHITE EPDM over the off-white Primer |
Applying Liquid EPDM |
Applying Primer on Top |
On Saturday, Alfredo, Lilly, and Keith joined the ranks (a few too many hands) to apply the Liquid EPDM to all of the previously applied primer.
Finishing on the West side |
The day's work done! |
We sat back and rested and waited for the rain.
No leaks where there was Liquid EPDM. Some leaks where there was no waterproofing material.
SUCCESS!
We still have to finish the West Annex, the tunnel and the retaining wall joints.
Now we await dry weather so we can finish the waterproofing. We need 4 days in a row of no rain. Perhaps after Father's Day.