19 September 2013

The Mound is Complete

Next steps, mulch and seed to protect the exposed soil from the weather.  We still have plenty of dirt in piles near the house.

We (Bill, Carol, Brad, Kim, and Glen) installed the hydrant at the garage.  Next step there, is to extend the french drain, grade the dirt for installing the umbrella, install it, cover with topsoil, and seed. That is in front of the garage.  The top of the garage still needs it's umbrella. And the front NEEDS it's stucco.

Meanwhile, next week, we intend to try out the mortar sprayer for interior plastering.  