We have had a mishap this month. Damien was up on the scaffold working on the steel arches, scraping them, preparing for paint. He took a fall, but landed on his feet. He did not break any bones, hit his head or lose consciousness. He was very lucky. We look forward to his full recovery.
Bill has been working on the pocket doors and the west arch. Two of the five pocket doors are installed (framing and tracks) and drywall applied. The arch is structurally there with drywall and mesh and is in the mudding process.
Pocked Door Installation #1 -Second Floor Office/Bedroom |
Pocked Door Installation #2 - First Floor Bedroom |
West Arch looking Southwest |
Kim, Damien, and Brian have finished the scraping/paint preparation. Kim has started painting the steel arches in the barrel vault in the living room. The concrete part still needs to be done.
No comments:
Post a Comment