15 October 2015
The Barrel Vault in the Living Room is Painted
We are very happy that the ceiling is finished in the living room. Bill is currently working on the window frames (drywall) and then we will be making the wall smooth enough for paint.
13 October 2015
The Last Windows are getting Trimmed
We are working on those mini-projects that require the scaffold in the living room. I am working on finishing up the barrel vault painting. Bill is working on the window trim. You can see the windows on the right are trimmed, and those on the left are still to be done.
After this wall is completed, we just have one pocket door to be framed, and after the drywall is applied, we will be done hanging drywall in the house proper!
Meanwhile, we are getting quotes on getting the floors done. Next week, we take delivery on materials to frame the North deck.
After this wall is completed, we just have one pocket door to be framed, and after the drywall is applied, we will be done hanging drywall in the house proper!
Meanwhile, we are getting quotes on getting the floors done. Next week, we take delivery on materials to frame the North deck.
26 September 2015
Painting the Living Room Barrel Vault Ceiling
Yesterday, I painted one of the 'bays' - the 6 foot wide arch from 9 ft from the first floor to the center beam. And today, Bill and I finished the next two bays so that the West side of the living room is finished except for some touch-up.
As you can see, we still have the East side to do.....another day.
As you can see, we still have the East side to do.....another day.
23 August 2015
North Wall with Leaky Windows vs North Wall with New Windows
| Leaky Windows 8 ft tall |
The carpenters cut away the EIFS and took out the windows on the first floor, replaced Tyvek, flashing and caulk. They installed the new windows and put an extra strip of flashing over the windows. They also took the door frame out, made sure the door would fit the new door frame, which is made out of PVC, and installed the door and new frame and installed flashing over the door. It now works without binding. Vincent was able to enlist the services of Wade to remedy the EIFS and caulk around the windows and doors.
| New 6 ft tall Windows, Door, and slab |
We water tested with a hose, but have not had a decent rain, nor a Nor'easter, to check the weatherproofness of the windows.
The next step on this wall is a deck. We are awaiting availability of the carpentry crew - they are expected to be here before the end of September.
Meanwhile, we will be working indoors on the drywall and painting that could not be accomplished while the windows were leaking.
05 August 2015
The North Side of House - Before and After (Slab, Windows, Door, HVAC)
| North Side of House Before Patio |
| North Side of House After Patio |
And in the "after that" picture, we have the plastic off, and we have replaced the windows and entry door on the first floor. The EIFS is scheduled to be repaired next week. You may also notice on the left, a new HVAC heat pump unit. And our Serious Materials Windows that we were not doing their job, are on pallets laying around waiting for some way to use leaky windows. They are replaced with Simonton Windows.
| North Side After THAT! |
18 June 2015
Garage Temperature, House still in Drywall mode, Concrete Excitement
I visited the garage Wednesday. It still needs some work done. But I was interested in the temperature and whether it had any humidity problems. We have a Min-Max thermometer there. The current temperature was 70.3 F The Max was 71.0 F and the Min was 47.8 F. I reset it. I did not see any moisture or feel any. The earth tubes and umbrella seem to be keeping the garage at a good temperature. We still need to finish the insulation on the end wall around the garage door, and do drywall and incorporate electric lights. The garage will have to wait, our main priority is the house at this point.
We continue to continue to mud and sand. We still have the North wall awaiting the deck installation and the solution to our window leak problems. We had some signs of humidity in the house and we found that our HVAC contractor cannot install our system until mid August, so we invested in a dehumidifier. For now, any humidity problems are gone. It is a very pleasant 71 F, and a little hotter upstairs.
On the exciting side, our concrete contractor showed up today. They started grading for the slab on the North side and setting forms.
We continue to continue to mud and sand. We still have the North wall awaiting the deck installation and the solution to our window leak problems. We had some signs of humidity in the house and we found that our HVAC contractor cannot install our system until mid August, so we invested in a dehumidifier. For now, any humidity problems are gone. It is a very pleasant 71 F, and a little hotter upstairs.
On the exciting side, our concrete contractor showed up today. They started grading for the slab on the North side and setting forms.
24 April 2015
Continued Drywall and Paint Progress
The house project is progressing. Perhaps not at a spectacular pace, but we are happy with the progress.
We have had a mishap this month. Damien was up on the scaffold working on the steel arches, scraping them, preparing for paint. He took a fall, but landed on his feet. He did not break any bones, hit his head or lose consciousness. He was very lucky. We look forward to his full recovery.
Bill has been working on the pocket doors and the west arch. Two of the five pocket doors are installed (framing and tracks) and drywall applied. The arch is structurally there with drywall and mesh and is in the mudding process.
Kim, Damien, and Brian have finished the scraping/paint preparation. Kim has started painting the steel arches in the barrel vault in the living room. The concrete part still needs to be done.
We have had a mishap this month. Damien was up on the scaffold working on the steel arches, scraping them, preparing for paint. He took a fall, but landed on his feet. He did not break any bones, hit his head or lose consciousness. He was very lucky. We look forward to his full recovery.
Bill has been working on the pocket doors and the west arch. Two of the five pocket doors are installed (framing and tracks) and drywall applied. The arch is structurally there with drywall and mesh and is in the mudding process.
| Pocked Door Installation #1 -Second Floor Office/Bedroom |
| Pocked Door Installation #2 - First Floor Bedroom |
| West Arch looking Southwest |
Kim, Damien, and Brian have finished the scraping/paint preparation. Kim has started painting the steel arches in the barrel vault in the living room. The concrete part still needs to be done.