Vincent, Bruce and Eric have made great progress in framing out the first floor. They are almost ready to set the beam that holds the shorter I Joists in place.
|
I Joists in 2 piles on the left are all of 20 ft length and in the distance, you may just be able to make out 3 utility poles lying on the ground |
Meanwhile, Bill and Carol and her husband, Steven, worked on the I Joists, stiffening the ends and moving them up to the house from the garage. We are on target for Saturday's Second Floor Installation Event - and the weather looks to be on target too.
|
The 20 ft I Joists that don't require stiffening |
|
Our subflooring ready to be installed |
|
Another view of those I Joists with a LVL that will find a place in our house |